This week the emphasis was on the installation of the main electrical panel, electrical boxes, and, lighting cans in the framing. The class also completed the installation of the exterior wood trim around the windows, and one piece that had gotten damaged during construction.
Subscribe to:
Post Comments (Atom)
-
I hope everyone's time away from school was at least relaxing, and I hope you are wanting to get back into the school of things! Some o...
-
Today students are using their time to teach me something new...like a game they play or simply how to do something. Here is a "how t...
No comments:
Post a Comment