The East gate was installed on Saturday. The West gate will be installed on Monday, Jan 10.
On Jan 6 the tiny trailer was moved from its current and original location into the campus to a location in front of rooms 13 and 14. The move was made available by the school fence being removed by contractors over the holiday break. Soon there should be a gate installed, at the moment the opening is closed by a chain-link fence.
No comments:
Post a Comment